I just received my Pro Plunge, what are my first steps?Updated 5 months ago
Initial Setup Upon Receiving Your Cold Plunge
1. Closing the Drain Valve
- Locate the valve on the right-hand side of the chiller.
- Ensure the valve is closed. A closed valve is perpendicular to the pipe. (Refer to the diagram for clarity.)
2. Removing Internal Components
- Use a screwdriver to open the grate and push it upward to remove it.
- Remove the skimmer and place it beside the grate.
- Unscrew the filter and set it aside as well.
3. Breaking the Airlock
- Follow the provided instructions or watch the linked video to push water through the system and break the airlock.
Airlock video: https://www.youtube.com/watch?v=Zo29I1PDjfw