Coldture  logo
Coldture  logo

All articles

I just received my Pro Plunge, what are my first steps?Updated 5 months ago

Initial Setup Upon Receiving Your Cold Plunge 


1. Closing the Drain Valve

- Locate the valve on the right-hand side of the chiller.  

- Ensure the valve is closed. A closed valve is perpendicular to the pipe. (Refer to the diagram for clarity.)  

2. Removing Internal Components 

- Use a screwdriver to open the grate and push it upward to remove it.  

- Remove the skimmer and place it beside the grate.  

- Unscrew the filter and set it aside as well.  


3. Breaking the Airlock

- Follow the provided instructions or watch the linked video to push water through the system and break the airlock.  

Airlock video: https://www.youtube.com/watch?v=Zo29I1PDjfw

Was this article helpful?
Yes
No